Up MGTD15470 » On Going Maintenance » Adding Anti Sway Bar Prev Next Slideshow

 Previous image  Next image  Index page
Chevy suspension components
attaching hardware links and  bar in primer
attaching hardware links and bar in paint
Finished bar mount brackets
Pressing in bar link bearing
  drilling second hole in brackets.jpg - Fully boxed A-arm bracket. The large hole for the rubber link mounts goes to the outside. One hole goes to one of the TD A-arm to pan bolts, the other goes to a newly drilled hole. The MGB has welded mounting points, but I think it is overbuilt. this sandwich construciton will be plenty strong. After all, the spring pan is only held by bolts.  
drilling second hole in brackets 2
Bracket mount on A arm 01
Bracket mount on A arm 02
Bracket mount on A arm 03
Bracket mount on A arm 04

8 | Fully boxed A-arm bracket. The large hole for the rubber link mounts goes to the outside. One hole goes to one of the TD A-arm to pan bolts, the other goes to a newly drilled hole. The MGB has welded mounting points, but I think it is overbuilt. this sandwich construciton will be plenty strong. After all, the spring pan is only held by bolts. Download
Total images: 25 | Help